Friday, May 26, 2017
| 2:39:27 AM

***   water shortage due to development work****REQUEST FOR PROPOSAL OF Selection of Chartered Accountant Firm to Conduct Audit of KW&SB's ANNUAL ACCOUNTS download live**  University Road in the ongoing work on NIPA spread Hassan Square on Thursday, April 27 will be 24-inch diameter pipeline connecting of 33-inch diameter pipeline and branch laynunsy, spokesman ***KARACHI: Sindh government on 13 March 2017 appointed Syed Hashim Raza Zaidi as Managing Director (MD), Karachi Water and Sewerage Board (KWSB). According to KWSB spokesman, the service and general administration department, government of Sindh, issued the posting order with the approval of Sindh Chief Secretary.***** Don’t let water waste away, so we can have it another day** *Big and small, saving water, helps us all**

  • Complain
    Complain
  • MD
    MD
  • KWSB TECHNICAL SITE
    PUMPING STATIONS KWSB
  • MD
    MD
  • MD KWSB HRZ
    COD FILTER PLANT
  • Complain
    Complain
  • DISTRIBUTION OF APPOINTMENT LETTER
    DISTRIBUTION OF APPOINTMENT LETTER
  • MD KWSB HRZ
    MD KWSB VISIT FILTER PLANT
  • MD KWSB HRZ
    MD KWSB VISIT ENGINEERING SITE
  • MD KWSB HRZ
    MD KWSB VISIT FILTER PLANT
  • MD KWSB HRZ
    MD KWSB HRZ
  • MD KWSB HRZ
    BALLOTING FOR HAJJ
  • DISTRIBUTION OF APPOINTMENT LETTER
    DISTRIBUTION OF APPOINTMENT LETTER
  • Complain
    Complain
  • DISTRIBUTION OF APPOINTMENT LETTER
    DISTRIBUTION OF APPOINTMENT LETTER
  • MD KWSB HRZ
    ANNOUNCEMENT FOR HAJJ BALLOTING
  • MD KWSB HRZ
    MD KWSB HRZ
  • KWSB EVENT
    BULK WATER SUPPLY SCHEME K-IV
  • Complain
    Complain
  • MD KWSB HRZ
    MD KWSB VISIT CANAL
  • MD KWSB HRZ
    MD KWSB HRZ
  • Complain
    Complain
  • KWSBPIC
    MESSAGE FROM MD KWSB
  • KWSBPIC
    KWSBPIC
  • KWSBPIC
    KWSBPIC
  • Save Water
    save water save life
  • Water Supply
    Water Supply scheme for different islands of Karachi
  • Galte Valve
    Gate Valve installation at Baldia Town
  • Gujjo
    GUJJO HEADWORK
  • Complain
    Complain
Information Desk

For emergency problems regarding your home or street sewerage complaints
please contact:
MD Camp Office
99244595 - 99244596
Customer Service Centre Karsaz 
99245138 - 99245140
Head Office Complaint Centre 
99230317

Customer Care Centre

Water Tariff
Sewerage Tariff
Post an Online Complaint
Online New Connection Form
Commercial Connection Form

Karachi Water & Sewerage Board

K.D.A Annexi Building, Behind Civic Center, Karachi

APPLICATION FORM FOR WATER CONNECTION
1. Name of Applicant
2. Name of Project
3. Father's / Husband's Name
4. Full Address at which connection is required
5. Postal Address
6. Panchayat Committe No. / Quarter Code
7. Status of applicant (Copy of the documents in supports of the statement be enclosed)
8. Area of Plot sq. Yds.
8a. 7A: Covered Area of Flat Sq. ft.
8b. .No. of Stories
9. Net Annual Rental Value per year (as per Taxation Deptt: Assessment from P.T.I)
10. Number and size of water connection applied for
11. Purpose for which water connection is required
Note: a) In case of construction purpose, 2 Nos. attested copies of approved plan should be enclosed. b) For commercial/trading/industrial purposes, Municipal license or other documentary evidence to be shown and is attested copies should be attached).
12. Wheather prepared to install water meter at own risk and cost
13. No. and size for existing water connection in the premises
14. In case of addition water connection. why it is required
15. Has any construction been carried out on the premises? if so give details
16. Are all taxes paid in respect of the premises from the date of occuption (attach documentary evidence) Please Attach documentary evidence with downloded form
17. Name and address of the licenced plumber who will carry out the work
Signature of the Applicant _______________________________
Name
NIC No.
Signature of licenced plumber and
Name
Licence No.
NIC No.



HOW I MAY OBTAIN A NEW CONNECTION



Fill the respective application form for water connection attached / enclosed the required document's pertaining to the property where water connection is required and submit it to the respective revenue office of KWSB . Deposit challan in the concern bank which is issued by revenue of KWSB 9th mile Karsaz. 

 

 

Download Application Form for New Water Connection Commercial

Connection Services Charges

OTHER INFORMATION

Standard operating procedure for new Bulk/ industrial Socities / high Rise / Commercial Water connection

 

Check list of the Applicant

 

APPLICATION FORM FOR COMMERCIAL WATER CONNECTION

 



A, B, C, D, E.

A= APPLICATION FORM FOR COMMERCIAL WATER CONNECTION
B= ENGINEERING DEPARTMENT REPORT
C= BILLING & RECOVERY DEPARTMENT REPORT
D= SANCTION ORDER
E= Part-E To be filled in by Dy. Director Taxes